Construction
The gravel is carried over and spread throughout to prepare for the cement pour [September 2].
Preparing the concrete formwork for the interior walls [Sept. 2].
Sifting on-site dirt to make earth mix for plastering and mortar [Sept. 2].
Wood pallets are placed into erected wall frames [Sept. 3].
Recycled wood pallets are customed and secured with wood stud framing [Sept. 2-4].
Exterior wall details [Sept. 3].
Installing the east-facing window [Sept. 3].
Various phases of construction [Sept. 2 - 11].
Adobe interior walls erected [Oct. 8].
House near completion [Oct. 8 ].